Let us give you call
Thank you for reaching out to us
We’ll reach out to you within 24hrs
Oops! Something went wrong while submitting the form.
Crimson
360.View

Crimson

From  INR
+
Reserve Your 
Crimson
 Now
Front view
Top view
Side view
Close view
Close view
Close view
Close view
Close view
Close view
Close view
Front view
Top view
Side view
Close view
Close view
Front view
Top view
Side view
Close view
Close view
Close view
Close view
Front view
Top view
Side view
Close view
Close view
Front view
Top view
Side view
Close view

Built-In Features

Home . Heart . Harmony
Convenience
Composting Setup, Smart Over-Head Tank
Home automation
Smart Locks, Smart Camera, Smart Homes
Design
Green Walls, Sun-Glare Control, Air-Flow Technique
Safety & Security
Glass Shatter Sensing Alarms & Smoke Detectors

Sustainable Add On’s

Home . Heart . Harmony
Double Glazing or Reflective Glass
Solar
Insulated Walls
& Roof
Rain Water Harvesting

Floor Plans

Built to Last, Ready to Deliver

Sub Structure On-Site
Super Structure Installation
Finishing
Day 0
Day 90
Day 01
Production Drawings
Creating detailed shop drawings for elements.
Production Drawings
Preparing reinforcement detailing for structural integrity.
Production Drawings
Completing MEP detailing for systems.
Production Drawings
Releasing finalised drawings for production.
Production of Elements
Preparing moulds for casting elements.
Production of Elements
Producing foundations, walls, slabs, and staircases with MEP provisions.
Production of Elements
Applying post-casting finishes for durability and appearance.
Production of Elements
Curing the cast elements to required strength.
Production of Elements
Preparing cured elements for safe transport.
Production of Elements
Transporting and delivering elements to site.
Substructure On-Site
Digging the site to prepare for the foundation
Substructure On-Site
Building the foundation to support the structure
Substructure On-Site
Erecting the wall above the foundation
Substructure On-Site
Applying chemicals to prevent termite damage
Substructure On-Site
Filling and compacting soil around the foundation
Superstructure Installation
Assembling pre-made panels and floor slabs
Superstructure Installation
Constructing walls, beams, and roof slabs
Superstructure Installation
Sealing joints and applying waterproofing measures
Superstructure Installation
Treating the roof and installing parapet walls
Superstructure Installation
Laying out electrical wiring and plumbing conduits
Finishing
Installing doors and windows
Finishing
Laying tiles and stone surfaces
Finishing
Installing electrical and plumbing fixtures
Finishing
Painting the structure and completing outdoor areas, including Porch and Patios

Take a closer look

Keep Exploring

Prism
Start From
Explore product
Area Range
Theme
Price Range
Entry Facing
Skylight
Configurations
No. of Floors
No. of Layouts
Area Range
Theme
Price Range
Entry Facing
Skylight
Configurations
No. of Floors
No. of Layouts
Zenith
Start From
Explore product
Area Range
Theme
Price Range
Entry Facing
Skylight
Configurations
No. of Floors
No. of Layouts
Area Range
Theme
Price Range
Entry Facing
Skylight
Configurations
No. of Floors
No. of Layouts
Titan
Start From
Explore product
Area Range
Theme
Price Range
Entry Facing
Skylight
Configurations
No. of Floors
No. of Layouts
Area Range
Theme
Price Range
Entry Facing
Skylight
Configurations
No. of Floors
No. of Layouts